Overview

A multimodal transportation plan is in the works for the Pagosa Springs East End area that will assess pedestrian sidewalk and trail connectivity, river and park access, public parking, functionality of roadways and traffic flow in the area, transit opportunities, urban design updates, and more. The plan aims to create a stronger connection between the East End and other areas of town, while providing a better functioning multimodal environment that supports access to businesses and recreational opportunities for residents and visitors alike.


What is a multimodal plan? Multimodal refers to a variety of different transportation types – vehicles, pedestrians, and cyclists – and the availability of infrastructure to support these different groups. The East End Multimodal Plan will evaluate how traffic currently moves through the area and potential changes that can help to alleviate some of the current challenges. The plan will evaluate parking availability and how people access the various parking areas within the East End. Finally, the plan will examine walking and biking conditions and will propose improvements to make walking and biking safer for people going to businesses, the Farmers Market, and recreational opportunities. The plan document will define a vision that will specify actions, priorities, funding opportunities, and next steps for the Town.

Where is the East End Study Area? The East End Study Area extends roughly between First Street to just east of the Highway 160/84 interchange.

Community Input

We have valued your input, involvement, and critical feedback through each step of the project! In total, we hosted four public input meetings: three in person and one virtual, and have also allowed the public to provide comments throughout the project on the project website. We also sought feedback through a virtual survey in November. Business and property owners in the East End were provided a separate survey to understand key transportation and connectivity issues moving forward. The ideas and comments provided through the meetings and surveys have been incorporated into the final plan.


Schedule of Community Input Opportunities

Public Meeting #1: Existing Conditions, October 6th, 2021

Public Meeting #2: Visioning & Opportunities, December, 2021 (virtual / online)

Public Meeting #3: East End Scenarios (April 27, 2022)

Public Meeting #4: Recommendations & Priorities (September 21, 2022)

Share Your Feedback

View and share your comments on the project boards from the latest public meeting, held in Pagosa Springs on September 21st. Click the images below to see them full screen, or download a pdf of all of the following slides here. After reviewing the boards, we invite you to vote for your top priority projects (more details below).


Phase 3 Public Input Summary

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Preferred Concept Overview

"*" indicates required fields

Concept A

"*" indicates required fields

Concept B

"*" indicates required fields

Hwy 160/84 5-Leg Roundabout

"*" indicates required fields

Illustrative Concept

"*" indicates required fields

Illustrative Concept

"*" indicates required fields


Select Your Top Six Priority Projects

The following two tables list the 22 projects developed as part of this plan. The map shows where these projects would be located, based on the unique ID number associated with each project in the tables. We’re asking you to pick your top six priority projects to help determine which projects are most important to the public. To share your top six priority projects, select the unique project numbers in the dropdowns below.

East End Priority Projects – 1

Priority Project Overview

East End Priority Projects – 2

Share your Top Six Priority Projects using the dropdowns below

We're asking you to pick your top six priority projects to help determine which projects are most important to the public. To share your top six priority projects, select the unique project numbers in the dropdowns below. The order in which you select the projects is not important, all six are weighted evenly.

Timeline

The East End Multimodal Transportation Plan is scheduled to be completed by the fall of 2022.


Plan Events

Project Kickoff
September 2021
Public Meeting #2: Visioning
December 2021
Public Meeting #3: East End Scenarios
April 2022
Public Meeting #4: Recommendations & Priorities
SEPTEMBER 2022
Existing Conditions Assessment
September 2021 – November 2021
Opportunities, Constraints, & Vision
November 2021 – December 2021
Scenario Development
January 2022 – May 2022
Design Guidelines & Implementation Plan
JUNE 2022 – SEPTEMBER 2022
Multimodal Plan Development
AUGUST 2022 – NOVEMBER 2022

Events


Upcoming Events

Check back soon for upcoming events!

Past Events

East End Public Open House

October 6, 2021 at 4:00 pm – 6:00 pm

See the event’s station boards here

East End Walking Tour

October 7, 2021

Public Meeting #2: Visioning

January 1, 2022

January – February 2022

Public Meeting #3: East End Scenarios

April 27, 2022

See the event’s station boards here

Public Meeting #4: Recommendations & Priorities

September 21, 2022 at 5:00 pm – 7:00 pm

See the event’s station boards here

Project Documents

This section includes various project documents, exhibits, graphics, and other project development materials to be shared with you throughout the process. Keep checking back here to see our progress!


Public Meeting #4 Boards
Download pdf
Public Meeting #3 Boards
Download pdf
Public Open House Station Boards
Download pdf
Virtual Open House Summary
Download pdf

Contact

If you have any comments or questions about the project, you can reach James Dickhoff, Town of Pagosa Springs Planning Department Director, at jdickhoff@pagosasprings.co.gov or use the form below to send the project team your comments and questions.

  • This field is for validation purposes and should be left unchanged.

Keep in Touch!

  • This field is for validation purposes and should be left unchanged.